Slopes Give Warning Before They Fail
According to USGS research, rainfall is the primary trigger for slope failure. A slope’s vulnerability builds gradually, weakening over months or years before a rainfall event raises pore water pressure to the point of failure. By the time visible signs appear on the surface, the warning window may already have passed.
Under Singapore’s Building Control Regulations, instrumentation and monitoring plans are a statutory requirement for geotechnical works involving slopes. BCA requires qualified persons to determine appropriate monitoring of pore water pressures, water table levels, and ground deformation with defined instruments, frequencies, and reporting. Wetec designs and supply slope monitoring systems that meet these requirements, integrating multiple data streams into a single automated early warning system.